Alex777 написал(а):
Добрый день, подскажите значение галок "Цикл - разделить все соединения"
Цитата:
Полное разделение цикла (отрицательная цена)
By setting this indicator, you specify that the system completely cuts a cycle during multilevel material price determination if negative prices appear with one or more materials of the cycle. In this way, all input materials that are also output materials of the cycle are ignored. The cycle is costed as a one-way level.
If you do not set the indicator, the materials of the cycle are not costed. Pay attention to the messages.
For more information choose SAP Library -> Accounting -> Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Multilevel Actual Costing -> Costing Run: Multilevel Actual Costing -> Process Flow: Multilevel Actual Costing -> Performing Multilevel Material Price Determination ->Error During Multilevel Material Price Determination -> Automatic Error Correction by the system, and read the section Cutting Connections in a Cycle.
Alex777 написал(а):
и "направленный уровень - сокращенная спецификация" в опциях постобработки в многоуровневом расчете цен.
Цитата:
Разрешение сокращенн. ФактСпецификации (ошибка ПорогЗначен)
By setting this indicator, you specify that the actual BOM is reduced in multilevel material price determination if extreme price changes appear as a result of large multilevel variances. You can carry out multilevel price determination through reduction of the actual BOM.
If you do not set the indicator, the faulty materials are not costed. Pay attention to the messages.
For more information, choose SAP Library -> Accounting -> Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Multilevel Actual Costing -> Costing Run: Multilevel Actual Costing -> Process Flow: Multilevel Actual Costing -> Performing Multilevel Material Price Determination-> Error During Multilevel Material Price Determination -> Automatic Error Correction by the System, and read the section Reduction of the Actual BOM.